document-library-lite
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/ubecgov/public_html/wp-includes/functions.php on line 6121ooohboi-steroids
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/ubecgov/public_html/wp-includes/functions.php on line 6121The Executive Secretary of the Universal Basic Education Commission (UBEC), Aisha Garba, received the Director-General of the Bureau of Public Procurement (BPP), Dr. Adebowole Adedokun, along with his management team at the Commission\u2019s headquarters.<\/p>\n\n\n\n
The visit aimed to support the Executive Secretary in strengthening procurement processes within UBEC and to advocate for collaboration in ensuring best practices across the Commission and State Universal Basic Education Boards (SUBEBs).<\/p>\n\n\n\n
This meeting underscores UBEC\u2019s commitment to transparency and accountability in its procurement processes. By working closely with the Bureau of Public Procurement, UBEC seeks to align its procurement framework with global best practices.<\/p>\n\n\n\n
Under Aisha Garba\u2019s leadership, UBEC remains dedicated to complying with procurement regulations that enhance the quality of basic education in Nigeria.<\/p>\n\n\n\n The Executive Secretary of the Universal Basic Education Commission (UBEC), Aisha Garba, received the Director-General of the Bureau of Public Procurement (BPP), Dr. Adebowole Adedokun, along with his management team at the Commission\u2019s headquarters. The visit aimed to support the Executive Secretary in strengthening procurement processes within UBEC and to advocate for collaboration in ensuring … Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":7089,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[56,60],"tags":[40],"class_list":["post-7087","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-meeting","category-visit","tag-educationforall"],"rttpg_featured_image_url":{"full":["https:\/\/ubec.gov.ng\/wp-content\/uploads\/2025\/04\/SaveClip.App_486343462_1207537324037165_2235154306061029011_n.jpg",1080,720,false],"landscape":["https:\/\/ubec.gov.ng\/wp-content\/uploads\/2025\/04\/SaveClip.App_486343462_1207537324037165_2235154306061029011_n.jpg",1080,720,false],"portraits":["https:\/\/ubec.gov.ng\/wp-content\/uploads\/2025\/04\/SaveClip.App_486343462_1207537324037165_2235154306061029011_n.jpg",1080,720,false],"thumbnail":["https:\/\/ubec.gov.ng\/wp-content\/uploads\/2025\/04\/SaveClip.App_486343462_1207537324037165_2235154306061029011_n-150x150.jpg",150,150,true],"medium":["https:\/\/ubec.gov.ng\/wp-content\/uploads\/2025\/04\/SaveClip.App_486343462_1207537324037165_2235154306061029011_n-300x200.jpg",300,200,true],"large":["https:\/\/ubec.gov.ng\/wp-content\/uploads\/2025\/04\/SaveClip.App_486343462_1207537324037165_2235154306061029011_n-1024x683.jpg",1024,683,true],"1536x1536":["https:\/\/ubec.gov.ng\/wp-content\/uploads\/2025\/04\/SaveClip.App_486343462_1207537324037165_2235154306061029011_n.jpg",1080,720,false],"2048x2048":["https:\/\/ubec.gov.ng\/wp-content\/uploads\/2025\/04\/SaveClip.App_486343462_1207537324037165_2235154306061029011_n.jpg",1080,720,false]},"rttpg_author":{"display_name":"Administrator","author_link":"https:\/\/ubec.gov.ng\/author\/admin\/"},"rttpg_comment":0,"rttpg_category":"Meeting<\/a> Visit<\/a>","rttpg_excerpt":"The Executive Secretary of the Universal Basic Education Commission (UBEC), Aisha Garba, received the Director-General of the Bureau of Public Procurement (BPP), Dr. Adebowole Adedokun, along with his management team at the Commission\u2019s headquarters. The visit aimed to support the Executive Secretary in strengthening procurement processes within UBEC and to advocate for collaboration in ensuring…","_links":{"self":[{"href":"https:\/\/ubec.gov.ng\/wp-json\/wp\/v2\/posts\/7087","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ubec.gov.ng\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ubec.gov.ng\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ubec.gov.ng\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ubec.gov.ng\/wp-json\/wp\/v2\/comments?post=7087"}],"version-history":[{"count":1,"href":"https:\/\/ubec.gov.ng\/wp-json\/wp\/v2\/posts\/7087\/revisions"}],"predecessor-version":[{"id":7090,"href":"https:\/\/ubec.gov.ng\/wp-json\/wp\/v2\/posts\/7087\/revisions\/7090"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ubec.gov.ng\/wp-json\/wp\/v2\/media\/7089"}],"wp:attachment":[{"href":"https:\/\/ubec.gov.ng\/wp-json\/wp\/v2\/media?parent=7087"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ubec.gov.ng\/wp-json\/wp\/v2\/categories?post=7087"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ubec.gov.ng\/wp-json\/wp\/v2\/tags?post=7087"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}<\/figure>\n\n\n\n
<\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"